Design and Construction Standards Update Procedure
Updated: 12.11.2024
Design and Construction Standards Update Procedure
General Requirements: The Design and Construction Standards are intended to be periodically updated based on the following:
- Ongoing Construction Standards Meetings.
- Completion of open sections within the Design Standards.
- Changes requested by the MAC Airport Development.
- Changes requested by the Consultants.
- Introduction and acceptance of new products or procedures.
Update Process
- Proposed changes to be sent through the MAC DCS change form which is located here
- Proposed changes may come from any of the following, but not limited to:
- MAC facilities staff
- MAC design consultants
- MAC contracted consultants
- Tenants or their design consultant
- These updates need to be championed by MAC staff, who will input the information into the portal.
- The change is then taken through the review and approval process by the following:
- Department Manager of the proposer
- Senior Airport Architect and Senior Project Manager
- Building Official, Director of Airport Development Project Initiation, Director MSP Terminal and Landside Operations
- Vice President of Planning and Development
- Notification of this update will be sent through this platform.